2026-07-10
OEM Cat Scratcher Manufacturing: From Design to Bulk Production
See how an OEM cat scratcher project moves from inquiry and structure suggestion to sampling, approval, bulk production, quality check and shipment.

A clear project brief should include size, target market, quantity, artwork, packaging method and warehouse label requirements.
Regular samples usually take about 3-5 days.
Bulk production usually takes about 25-30 days after sample or order confirmation.
